Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh

Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway

Client

Saudi Electricity Company (SEC)

3
67 MVA
10
GIS
48
SWGR