Project Overview
Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The substation shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through Telecommunication system and gateway
Date
Client
Saudi Electricity Company (SEC)