Design & Build the Water Supply to the Third Ring Road in Al Adl Area

Project Overview

Design and Construction of a new transmission pipeline to supply water to the Million system. The proposed pipeline will have a diameter of 2500 mm. The eastern end of the Million supply line will be connected to the existing 2500 mm desalination transmission line currently under execution / the main transmission line at the Fourth Ring Road, while the western end of the main transmission line will be connected at the Third Ring Road.

The main sources of water supply to the proposed pipeline will be the desalination line under execution / the main transmission line at the Fourth Ring Road, and the main transmission line at the Third Ring Road.

Date

Client

Contract Type

Scope of Work

Consultant