380/110 KV BSP And Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2)

Project Overview

The Project involves the design, procurement, and construction of double circuit 380kV D/C OHTL along with (2) OPGW lines on EPC basis to connect between the existing Yanbu City (YCNT) 380/110kV BSP and existing Umlujj North (UMN) 380/132kV BSP with an approximate route length of 185 km.