Power Supply to Riyad Metro Substation (Metro Package 3)

Project Overview

Bin Omairah is proud of its participation in Riyadh Metro Project, one of the world’s largest metro projects comprising 6 metro lines that connect 85 stations and span nearly 176 Km of track.

In this Project, Bin Omairah executed the turnkey contract for the design, manufacture, delivery, installation, jointing, termination, testing, commissioning and put into service of the Main and Alternative Power Supply interconnections between METRO LINE 2 PP1 Substation situated in Olaya Main/Interchange Station 2B2 and SEC Grid Substations BSP S/S # 9051 and BSP S/S # 9053. This Project comprising laying of 144 Km of 33Kv Underground Cables with total route length of 54.5 Km.

Date

Client

Saudi Electricity Company (SEC)

Contract Type

Scope of Work

Consultant

10
No. Of Circuits
55KM
Route Length
144KM
U/G Cable Length
44.5KM
Fiber Optic Cable Length
49,000M3
Excavation Work
43,300M3
Backfilling Work
82,000M2
Asphalting Work
400M
HDD
300Joint
Insulated Joints