Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh

Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway

Date

Client

Saudi Electricity Company (SEC)

Contract Type

Scope of Work

Consultant

3
67 MVA
10
GIS
48
SWGR