Project Overview
Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in NORTH ALMORABA area Riyadh. The Scope of works includes associated works in remote end Substations # 9052 & 8102 . The substation shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway
Date
Client
Saudi Electricity Company (SEC)