Connection of New AsSafa BSP Substation #9014 with 132Kv Network

Project Overview

Bin Omairah executed the most strategic and highly rush turnkey contract for the design, manufacture, delivery, installation, jointing, termination, testing, commissioning and put into service of the connections of New AsSafa BSP Substation # 9014 to integrate it with 132Kv Network. This $102 million turnkey contract awarded to Bin Omairah by Saudi Electricity Co. (SEC) is considered the biggest ever Underground Transmission Power Lines Project at 132Kv voltage level in Central Operating Area (COA). This Project comprising laying of 304 Km of 132Kv Underground Cables in the most congested area in the heart of the old Riyadh City Centre “Al Batha Souq Area” to configure 23 circuits with total route length of 99.80 Km including 5.39 Km Horizontal Directional Drilling (HDD).

Date

Client

Saudi Electricity Company (SEC)

Contract Type

Scope of Work

Consultant

23 CCT
No. Of Circuits
103 km
Route Length
308km
132 kv U/G Cable Length
107km
Fiber Optics Cable Length
4.32km
HDD
12
No. of Districts
12
No. of Substations
738pcs
Insulated Joints
102pcs
GIS Termination
6pcs
Outdoor Termination
299,500Sqm
Asphalting Quantity